May 8
Bid ended
GTRA, Air Traffic Control Tower Renovations, PHASE 2 #18166
Replacement of door hardware, millwork, exterior painting, plumbing fixtures, electrical, aluminum canopies, exterior insulated metal panels. 2. Modernize existing hydraulic elevator.
Plans
(click to expand/collapse)

Name | Size | ||
25003.00_Complete Drawings_GTRA;AirTrafficControlTower Reno-PH2 | 3.3 MB |