May 8
Bid ended
GTRA, Air Traffic Control Tower Renovations, PHASE 2 #18166
Replacement of door hardware, millwork, exterior painting, plumbing fixtures, electrical, aluminum canopies, exterior insulated metal panels. 2. Modernize existing hydraulic elevator.
Addendum 1
(click to expand/collapse)

Name | Size | |||
GTRA Addendum #1_05.05.25 | 77.3 KB |
Pre-Bid Conference Agenda
(click to expand/collapse)

Name | Size | |||
Memo Pre Bid CONFERENCE Agenda_2025.04.23 | 285.8 KB |
Pre-Bid Conference Reminder
(click to expand/collapse)

Name | Size | |||
Memo_Reminder of PreBid Conference | 155.9 KB |